| HIGHLIGHTS
OF JOB HISTORY |
|
TYPE
OF JOB |
COMPANY
WORKED FOR |
COMPLETION
|
LOCATION |
APPROXIMATE
DOLLAR AMOUNT OF CONTRACT |
Install Foundations for
50 MMSCFD NGL Recovery Station |
Hanover Company |
2000 |
Borden Co., TX |
$ 96,600.00 |
Install (1) 10,350 HP
Solar Mars 90/C65 Compressor Station |
Florida Gas Transmission |
2000 |
Trenton, FL |
$ 2,446,000.00 |
Install (1) 16,500 HP
Electric Driven Centrifugal Compressor |
Williams Gas Pipeline - Transco |
2000 |
Coweta County, GA |
$ 2,220,000.00 |
Install (2) 3,500 HP
Solar Centaur Turbine/Compressor |
Coral Mexico Pipeline, LLC |
2000 |
Brooks County, TX |
$ 1,351,000.00 |
Install (1) 10,000 HP
Electric Motor W/Cooper Compressor/Turbine |
Enron Engineering & Construction |
2000 |
Gallup, NM |
$ 2,377,149.00 |
Install 10MM NRU Skid
Plant |
Black Warrior Methane/BCCK Engineering |
1999 |
Brookwood, AL |
$ 803,000.00 |
|
Fabricate 10MM NRU Skid
Plant for Black Warrior Methane |
BCCK Engineering |
1999 |
Abilene, TX |
$318,000.00 |
|
Install (1) 1600 HP Solar
Saturn Turbine/Compressor |
Southern Natural Gas |
1999 |
Northport, AL |
$685,000.00 |
|
Install (7) 6500 HP Electric
Motor Driven Compressors |
Enron Engineering & Construction |
1999 |
Houston, TX |
$5,260,000.00 |
|
Install (1) 5700 HP Solar
Centaur Turbine/Compressor |
Northwest Pipeline Corporation |
1999 |
Roosevelt, WA |
$1,139,000.00 |
|
Install (1) 4700 HP Solar
Centaur Turbine |
Southern Natural Gas |
1999 |
Providence, AL |
$1,089,000.00 |
|
Install (1) 18,000 HP
Solar Titan Turbine |
Columbia Gulf Transmission |
1999 |
Corinth, MS |
$2,039,000.00 |
|
Install (1) 18,000 HP
Solar Titan Turbine |
Columbia Gulf Transmission |
1999 |
Inverness, MS |
$1,822,000.00 |
|
Dismantling Diesel/Desulpurization
Unit |
Ventech Engineering |
1999 |
Abilene, TX |
$420,000.00 |
|
Piping Modifications
|
Marathon Oil Company |
1999 |
Garden City, LA |
$365,000.00 |
|
Fabricate 10MM NRU Skid
Plant for East Vealmoor Plant |
BCCK Engineering |
1999 |
Abilene, TX |
$363,000.00 |
|
Install (1) 15,000 HP
Solar Mars Turbine/Compressor |
Columbia Gulf Transmission |
1999 |
Hampshire, TN |
$1,555,000.00 |
|
Meter Station Construction |
Southern Natural Gas |
1999 |
Pascagoula, MS |
$147,000.00 |
|
Retire Solar Mars Turbine |
Columbia Gulf Transmission |
1999 |
Hampshire, TN |
$80,000.00 |
|
Meter Station Construction |
Columbia Gulf Transmission |
1999 |
Gallatin, TN |
$121,000.00 |
|
Install High Pressure
Gas Separators |
Florida Gas Transmission |
1998 |
Perry, FL |
Time & Material |
|
Install High Pressure
Gas Separators |
Columbia Gas Transmission |
1998 |
Elkview, WV |
$874,000.00 |
|
|
|