Ranger Plant Constructional Co., Inc. (RPC) has over 35 years of experience and has constructed more than 382 natural gas processing projects. Of this total, RPC has constructed 143 compressor stations since 1981. These stations have a total of 250 compressors with 1,437,958 total horsepower. Of these stations, 78 also included the installation of 114 turbines with 941,508 total horsepower.

Following is a table representing all horsepower installations since 1981.

Page 7 of 12
Jump to:

HORSEPOWER INSTALLATIONS
* Indicates Turbine Horsepower  
 

 3 - 4,000 H.P.

SOUTHERN NATURAL GAS
1900 5TH AVENUE NORTH
BIRMINGHAM, AL 35203

ENTERPRISE,
MS

1996

 1 - 6,000 H.P.
  ELECTRIC

ENRON ENGINEERING
NORTHERN NATURAL GAS
333 CLAY STREET
HOUSTON, TX 77002

HUBBARD,
IA

1995

 2 - 7,000 H.P.
  ELECTRIC

TRANSCONTINENTAL GAS P/L
2800 POST OAK BOULEVARD
HOUSTON, TX 77056

CHILTON CO.,
AL

1995

 2 - 6,000 H.P.
  ELECTRIC

TRANSCONTINENTAL GAS P/L
2800 POST OAK BOULEVARD
HOUSTON, TX 77056

HENRY CO.,
GA

1995

*1 - 14,100 H.P.

TRANSCONTINENTAL GAS P/L
2800 POST OAK BOULEVARD
HOUSTON, TX 77056

IREDELL CO.,
NC

1995

 2 - 8,000 H.P.

TENNESSEE GAS PIPELINE
P.O. BOX 2511
HOUSTON, TX 77001

NATCHITOCHES,
LA

1995

  2 - 4,000 H.P.

FLORIDA GAS TRANSMISSION
1400 SMITH STREET
HOUSTON, TX 77057

WIGGINS,
MS

1994

*2 - 12,600 H.P.

FLORIDA GAS TRANSMISSION
1400 SMITH STREET
HOUSTON, TX 77057

MT. VERNON,
AL

1994

 1 - 4,000 H.P.

FLORIDA GAS TRANSMISSION
1400 SMITH STREET
HOUSTON, TX 77057

MELBOURNE,
FL

1994

 1 - 5,000 H.P.

FLORIDA GAS TRANSMISSION
1400 SMITH STREET
HOUSTON, TX 77057

FT. PIERCE,
FL

1994

Page 7 of 12
Jump to:
© Ranger Plant Constructional Co., Inc. 5851 East Interstate 20 Abilene, Texas 79601